Why are bridge steel templates used in construction? Hubei Wangke Template Co., Ltd. tells everyone as follows:
In many cases, it is important to choose very good concrete quality for our bridge steel formwork, because the concrete structure The construction is very important to our staff. The cost of formwork works used in the construction of cast-in-place concrete structures is much higher than that of concrete structures. Therefore, we use advanced formwork technology to improve the quality of the project and speed up the construction speed, mainly to improve labor productivity, reduce project costs and achieve civilized construction.
So after the bridge template meets our basic cost requirements and our important quality issues, then steel template manufacturers Let’s briefly understand what regulations must be met for the installation and support of the template:
1. The template and its support should have sufficient load-bearing capacity, rigidity and stability, and must be able to reliably Withstand the weight/side pressure of pouring concrete and construction load.
Second, ensure the correct shape, size and mutual position of each part of the engineering structure and components.
Three, the structure is simple and easy to assemble and disassemble, and it is convenient for the binding and installation of steel bars, and it is in line with the pouring and maintenance of concrete And other process requirements.
Four. The joints (joints) of the template should be tight and there will be no leakage.
The quality of the bridge formwork is closely related to the quality of our concrete projects, so we It is good to choose a suitable bridge template. Because once the quality is not in place, the project cost will be increased at the same time, that is, the wife will be lost and the soldiers will be lost. This is a bad state.
Bridge steel formwork is used a lot in bridge construction, I will show you how to design bridge steel formwork
The bridge template should follow the following principles when designing:
1. The compressive strength of the steel formwork must be satisfied, not less than 2 to 3 times the actual bending strength;
2. Cut the joints as much as possible, and make the best use of the construction conditions (hoisting capacity, transportation conditions, etc.) A large formwork may be used to reduce the workload of on-site assembly and disassembly, which will help speed up the construction.
3. When planning the joints of steel molds, it is advisable to set a certain number of positioning pins, which is conducive to the stitching of the template. Control.
4. In order to prevent seepage, the joint of the two templates should be planned as a yin and yang connection.