As a responsible template production company, Hubei Wang Ke Formwork Co., Ltd. is not only responsible for the quality of the manufactured products, but also we are always concerned about the safety issues of building formwork in engineering construction. From the perspective of the building formwork manufacturer, let’s talk about the safety of building formwork installation in the process of building construction.

1. The impact of weather on construction safety: in rain, snow and strong winds and other weather conditions, prohibit Construction. When installing the foundation formwork, first check the stability of the foundation pit's soil wall and slope. If there is a risk of landslide or collapse, effective reinforcement measures must be taken first. After each layer of formwork is installed, the sawn wood powder on the floor, the remaining wooden beams, formwork, steel pipes, fasteners, etc. should be cleaned up. When cleaning the template and painting the large template release agent, the template must be firmly supported.
The operator must set up an escalator when going up and down the foundation pit, and must wear a safety helmet when entering the construction site. This is the safety knowledge of Hebei construction template manufacturers during the construction process. Everyone needs to pay attention to these points when carrying out construction to ensure that the construction is carried out in a safe environment.
In the process of setting up the support frame, we need to use the correct method in order to ensure the smooth work. , So here let us take a look at the key points of the setup. The erection should be carried out in strict accordance with the design size, and the joints of the vertical rod and the horizontal rod should be staggered and set in different sash layers.
2. Make sure that the quality of each fastener and steel pipe is qualified, and tighten each fastener The torque must be controlled within the specified range, and steel pipes that have been deformed after long-term use cannot be used.
3. Also make sure that the vertical deviation of the building template pole and the horizontal deviation of the crossbar are less than the relevant requirements.
4. The design of the foundation support must also meet the requirements of bearing capacity.