027-61569738

通用banner

ContactContact

Hubei Wangke Formwork Co., Ltd.

Phone: 027-61569738

Mobile:

186-7406-8039 (Manager Xiong)

186-5908-0615 (Manager Zhou)

Email:
waco9999@163.com

2709997662@qq.com

Address:
Room 2601, Office Building 5, Wuhan Tian Street, Qingnian Road, Jianghan District, Wuhan

No. 5 Road, Economic Development Zone, Hong'an County, Huanggang City, Hubei Province

Longteng Road, Xiayun Industrial Park, Xiayun Town, Pingba District, Anshun City, Guizhou Province

web:en.cnwaco.cn

Requirements on the manufacturing process of bridge steel formwork

2021-04-05 04:22:39
a

The use of bridge steel formwork is mainly used to build bridge steel formwork on railways and highways. With the second use, Hubei Wangke Formwork Co., Ltd. can cast concrete into beautiful equipment. It is widely used in the construction of bridge steel formwork. There are certain requirements in the process.

(1) The setting of the tire film in the bridge steel template, in order to be very convenient for processing, and also Quality assurance is needed. It is very suitable for setting up a unified bridge steel template. It can be spliced and assembled on the tire film on various parts of the bridge steel template. It is necessary to set the bridge steel template. On a relatively solid field, and also to make corrections.


Hubei Wangke Template Co., Ltd.


(2) The blanking process of the bridge steel formwork: the process of blanking is mainly based on the bridge steel formwork After designing the drawing, put it in a full-scale large sample, correct the size, and then make the standard template, which needs to be marked according to the standard template.

(3) The splicing and assembly process of the bridge steel template: the steel plate and the skeleton are mainly between the two The process of splicing and assembling the fetal membranes. These are all cut bridge steel templates. For the plane, the corresponding place is placed in the seam. After the splicing is completed, you need to carefully check the dimensions of the shape of the device. Make sure that the surrounding area is square. When there is no error in the inspection, use temporary electric welding to fix it. In the process of assembling the skeleton, the first thing to do is the horizontal ribs, then the vertical ribs, and then hang it after the welding is completed. Onto the steel plate and then welding.

(4) Drill through the wall bolt holes on the bridge steel template. After the steel template comes out, use an electric drill Holes for the wall bolts will be drilled on it to ensure the accuracy of the position. First, use a small-diameter drill to locate the hole, and then use a large-diameter drill to ream the hole.