027-61569738

通用banner

ContactContact

Hubei Wangke Formwork Co., Ltd.

Phone: 027-61569738

Mobile:

186-7406-8039 (Manager Xiong)

186-5908-0615 (Manager Zhou)

Email:
waco9999@163.com

2709997662@qq.com

Address:
Room 2601, Office Building 5, Wuhan Tian Street, Qingnian Road, Jianghan District, Wuhan

No. 5 Road, Economic Development Zone, Hong'an County, Huanggang City, Hubei Province

Longteng Road, Xiayun Industrial Park, Xiayun Town, Pingba District, Anshun City, Guizhou Province

web:en.cnwaco.cn

Instructions on storage and transportation of steel formwork

2021-04-07 04:25:23
a

The steel formwork is composed of slab structure, support system, operating platform and accessories. It is used to build cast-in-place walls And wall structure tool template. Its characteristic is that the size of the large formwork is the space, depth and floor height of the building. Hubei Wangke Formwork Co., Ltd.According to the pouring shape of the bridge steel formwork, it can be divided into: box girder formwork, T-beam formwork, cover beam formwork, and hollow beam formwork , Round formwork, protection beam formwork, pier column head formwork, etc.

The advantages of steel formwork: enhanced system, high component strength, high combined rigidity, high plate production accuracy, tight joints , Not easy to deform, good template integrity, strong seismic resistance


Hubei Wangke Template Co., Ltd.


The shortcomings of steel formwork: heavy formwork, mobile installation requires lifting machinery, high cost.

Instructions on storage and transportation of steel templates:

Steel template should be stored indoors as much as possible, or placed in a shed on site. If stored in an open place, it should be covered with canvas or iron sheet to prevent the steel template from rusting. Whether in the warehouse or on the construction site, the steel formwork should be stacked neatly according to the specifications and cannot be placed randomly.

The editor reminds everyone that when storing steel formwork, you should apply anti-rust oil on the surface of the formwork and the concrete. If the paint on the back is partially peeled off, it should be repainted.

Before installing the bridge steel formwork, a release agent should be used. The installation bottom surface of the vertical formwork should be flat and tidy, and reliable positioning measures should be taken. When using steel formwork in high-rise buildings, there should be lightning protection facilities. When installing and removing the template, there must be stable climbing tools or scaffolding. When working at heights, the operator should wear a seat belt.

remind everyone that when transporting steel templates, do not mix templates of different specifications. According to the structure, size and transportation conditions of the pre-assembled formwork, it can be transported in horizontal layers or in vertical grids.